An office building saved 37.5% on its elevator phone line
Schindler Ahead: Cost control case study
Characteristics | Details |
---|---|
Building Type | Class A office building in Williamsburg, VA with a Schindler Ahead connected elevator. |
Problem | Customer incurred an extra monthly cost for the analog emergency telephone line in the elevator. |
Solution | Schindler’s DigitalAlarm 4G wireless solution replaced the elevator’s analog phone line at a lower cost per month. |
Results | Customer realized a 37.5% annual cost savings for the elevator phone line by replacing the elevator analog phone line with Schindler DigitalAlarm. |