
Schindler understands how demanding public structures are. They have to provide mobility without interruption and restricted access - all at the same time. Schindler supports you at all stages, from determining specifications, to service and maintenance agreements after installation.
Jardine Schindler Group Head Office
29/F, Devon House Taikoo Place
979 King's Road
Quarry Bay, Hong Kong
The overall environmentally sound design strategically sites and orients to capture the natural light, heat, breeze and storm water and to reduce the use of energy.
Schindler’s Green elevators and escalators are selected in this development. Schindler supplied 17 elevators, including Schindler 7000 and Schindler 5400AP as well as 18 escalators to this campus development.
The Schindler 7000 elevators are equipped with regenerative drive. Schindler Power Factor One (PF1) converters ensure a high level of energy efficiency, where it allows power regenerated by the elevator to be consumed by other electrical appliances in the building. The efficiency oil free permanent magnet gearless motor in elevators and LED escalator skirt lighting allow further energy saving.
