High performance, efficient and effective

Schindler elevators and escalators can be found in notable office buildings around the world.  From a small two-story commercial building to a skyscraper in a major city, Schindler solutions for new installations, maintenance and modernization are unsurpassed.

Contact us

Schindler (China)Elevator Co.,Ltd

Schindler China Head Office

555, Xingshun Road, Jiading District, Shanghai (201815)

Tel. +86 21 6709 6666

Fax +86 21 6709 6677

Visualizing traffic

Schindler’s Traffic Vision tool helps to simulate traffic patterns in the building before starting construction. It identifies bottlenecks so we can find the right solution. It also provides vital information about energy consumption, so we can start eco-friendly efforts in the planning stage.

Green buildings

The highly efficient PORT Technology destination-dispatch system puts one elevator out of a group in full-sleep mode during off-peak periods with fast re-start. Our regenerative drive systems give electricity back to the grid to power other devices, without harmonic distortion. Combined with waste management during installation, these Schindler systems can contribute to green building certification.


Shanghai Jinhongqiao Center
Hebei Kaiyuan International Center